ENFR
Accueil PM: Heron Building
 
 
Tasks:
  Retail and Office refurbishment
Project Management.

- Assign the first floor which was initially used for offices, as a sale surface to the boutique at the ground floor - Complete strip out - implementation of restrooms in respect to the latest compulsory regulations - Area delivered as a cold shell.
- Study and replacement of the HVAC system in the respect to the latest regulations concerning the R22 gas. Installation of a new HVAC system for the whole 8 storey building. New interior design and architectural trades such as suspended ceiling - carpet tiles - electrical skirting.

- Monthly and bimonthly reports in English.
     
 
Information:
References:
  Location
Date
Owner
GF Tenant
Paris
2008
Heron
Elegance - Fashion store
Heron International
 
Share